Projects

Completed Project List

Seq. Name
1

Relocation of electrochlorination plant Port Dickson Power Plant to Paka Power Plant Terengganu.

2

To design, install and commissioning portable demin water plant at Port Dickson Power Plant

3

Rehabilitation of electrochlorination plant for Kapar Energy Ventures Sdn Bhd.

4

Supply, supervise and install guillotine dampers for unit 3 & 4 MILL isolation for Kapar Power Station

5
To design, install and commission close loop system for cooling water - by using shell & tube heat exchanger to Kenyir Hydro Plant (M&E Package)
6

Dismantle, supply, install and commission fully assembled electrolyzer for electrochlorination plant for Manjung Power Station.

7

To design, supply and fabricate of butterfly valves, actuators and expansion joint for pltu 1 Jawa Tengah 2 x (300-400mw) coal - fired power plant at Rembang, Jawa Tengah, Indonesia (Zelan Holdings (M) Sdn Bhd)

8
Rehabilitation of electrochlorination plant for TNB Paka Power Station
9

To design, repair and maintenance chimney for at TNB Janamanjung unit 1,2 &3.

10

Design, supply, install & commission MIL KSB Control Valve at Segari Power Plant- Lumut

11

Multiflue Chimney Repair Works at TNB Janamanjung

12

Supply, install & commission HPU (Bottom Ash Hopper Silo Gate Valve) at TNB Janamanjung

13

Service & supervise boiler feed pump at Kapar Power Plant

14

Design, install & commissioning minimum recirculating boiler feed water stop valve at Perlis Power Plant

15

Supply, install, commissioning boiler blow down and station ash pump at TNB Janamanjung

16

Installation & commissioning of various pump at Kapar Power Plant

17

Supply, install & commissioning Tricentric Butterfly Valve c/w electric actuator

18

Replacement of existing sodium hypochlorite injection pipeline at Kapar Power Plant

19

Installation & commissioning of various pumps at TNB Janamanjung

20

Supply various sizes boiler tubes (t91, a210, f22,)  at Kapar Power Plant

21

Supply HP circulation pump to Connaught Power Station.

22

Supply boiler feed pump to Connaught Power Station.

23

Supply boiler feed pump booster pump to Manjung Power Station.

24

Supply spare parts for condenser extraction pump to Manjung Power Station.

25

Supply BFP booster pump to Kapar Power Plant.

26

Supply high pressure sluice pump shaft and accessories for kapar power station

27

Supply high pressure sluice pump spare parts for Kapar Energy Ventures Sdn Bhd

28

Supply HP sluice pump bearing housing for Kapar Energy Ventures Sdn Bhd.

29

Supply spare parts for Hopkinson bled steam non return valves to Manjung Power Station. (Manufactured By Weir Valves & Controls UK)

30

Supply spare parts for Hopkinson Check Valve to Manjung Power Station.

31

Supply valve bled steam NRV (cold reheat) complete without actuator to Manjung Power Station.

32

To supply spare parts for GF3 cold reheat non return valve overhaul at Kapar Power Station.

33

Supply of cold reheat non return valve for Kapar Energy Ventures Sdn Bhd.

34

Supply boiler feed pump spare parts for Kapar Power Plant

35

Supply boiler feed pump spare parts for Manjung Power Station.

36

Supply Hopkinsons Valve Spare Parts for TNB Janamanjung - on going

37

Supply of KSB submersible pumps complete with motors for TNB

38

Supplied various parts for GE turbine frame 9e at Pahlawan Power Plan

39

Supplied bearing oil cooler- shell & tubes at Manjung Power Plant- Boiler Feed Pump

40

Supplied boiler feed pump cartridge to Kapar Power Plant

41

Supplied condensate extraction pumps to Manjung Power Station

42

Dismantle, install & commissioning 2 nos of heat exchanger- shell & tubes at Kapar Power Plant Ph 3

43

Supplied various spare parts for booster & boiler feed pump for Kapar Power Plant

44

To supply & apply polyurea coating on the steel structure- corrosion mitigation at Kapar Power Plant

45

Repair & service hp turbine bypass valve at Perlis Power Plant

46

To replace auxially shell & tubes heat exchangers to Kapar Power Plant PH 1

47

To replace shell & tubes heat exchangers for turbine oil cooler to Pahlawan Power Plant

48

Install 23 nos of Sanilec Electrolysers at Port Dickson Power Plant (year 2012)

49

To supply, install  and servicing IPBS at TNB Janamanjung

50

To supply, and install 10 nos of Sanilec Electrolyers at Port Dickson Power Plant - year 2013

51

To design, install and commissioning portable demin water plant at Port Dickson Power Plant

52

To supply, testing & commissioning 1 no of 412 KVA,  Transformer at TNB Port Dickson - Year 2012

53

To dismantle, install & commissioning 2 nos of Transformer  rectifier (5200 Amp @ 110 DC) at Kapar Power Plant Ph 2- Year 2013

54

To refurbished 30 nos of SANILEC cells Stream A at Janamanjung Power Plant- Year 2014

55

To supply Transformer Rectifier spare parts- Dyanapower at TNB Port Dickson - Year 2014

56

To supply various type of spare parts for Cylde Burgnmann  sootblower at Kapar Power

57

To supply various type of spare parts for Cylde Burgnmann sootblower at Tanjung Bin Power Plant - Year 2009-2010

58

To supply rubber expansion joint - TPSC (Prai Power Plant)

59

To fabricate steel structure at TNB Port Dickson Ph 2 - TPSC

60

To replace, supply and install various type of idler and pulley at Kapar Power Plant - LTSA for 2 years

61

To dismantle, install, test and commissioning 3.3 KV CONVEYOR & CRUSHER MOTOR

62

To dismantle, supply, install and commissioning 1 set Rotor for Induced Draft Fan at Kapar Power Plant- Unit 6

63

To dismantle, supply, install and commissioning 1 set Rotor for Induced Draft Fan at Kapar Power Plant- Unit 5

64

To replace, supply and install various type of idler and pulley at  Kapar Power Plant - Coal Unloaders

65

Supply, refurbish, and install 30 nos of Sanilec Electrolysers at Manjung Power Plant - Stream 1

66

Supply, refurbish, and install 30 nos of Sanilec Electrolysers at Manjung Power Plant -  Stream 2

67

Cooling Water Pipe Line Work - Prai Combined Cycle Gas Turbine Power Plant (Malaysia)

68

To supply manpower & Machinery to HSL (Singapore)

69

Installation of 508 nos. Of Precast, Pre stressed Concrete Spun Piles for the Construction of new Bulkhead, Wharf at Pulau Indah,  Malaysia-To supply manpower & Machinery to HSL(Singapore)

70

On Going- Offshore and onshore work scope for Track 3B- Super Critical Power Plant- Malaysia- To supply manpower & Machinery to  HSL (Singapore)

71

To replace, supply and install various type of idler and pulley at Kapar Power Plant - LTSA for 2 years (2013-2015)

72

To dismantle, install, test and commissioning 3.3 K CONVEYOR & CRUSHER MOTOR

73

To replace, supply and install various type of idler and pulley  at  Kapar Power Plant - Coal Unloader

74

To replace, supply and install various type of idler and pulley  at  Kapar Power Plant - Coal stacker reclaimer

75

To replace, supply and install bucket for coal unloader at  Kapar Power Plant

76

Supply, Install, Commissioning Boiler Blow Down and station Ash Plant at TNB Jana Manjung

77

Design, supply and installation of 5 years ash pond run off  forwarding pumps for coal and ash- TNB Jana Manjung

78

Design, supply and installation of  5 years clean rain water pump for coal and ash- TNB Jana Manjung

79

To replace, supply and install conveyor belt at  Kapar Power Plant

80

Structure repair of the existing stacker reclaimer B at Kapar Power Plant