| 1 | Relocation of electrochlorination plant Port Dickson Power Plant to Paka Power Plant Terengganu. | |
| 2 | To design, install and commissioning portable demin water plant at Port Dickson Power Plant | |
| 3 | Rehabilitation of electrochlorination plant for Kapar Energy Ventures Sdn Bhd. | |
| 4 | Supply, supervise and install guillotine dampers for unit 3 & 4 MILL isolation for Kapar Power Station | |
| 5 |
| |
| 6 | Dismantle, supply, install and commission fully assembled electrolyzer for electrochlorination plant for Manjung Power Station. | |
| 7 | To design, supply and fabricate of butterfly valves, actuators and expansion joint for pltu 1 Jawa Tengah 2 x (300-400mw) coal - fired power plant at Rembang, Jawa Tengah, Indonesia (Zelan Holdings (M) Sdn Bhd) | |
| 8 |
| |
| 9 | To design, repair and maintenance chimney for at TNB Janamanjung unit 1,2 &3. | |
| 10 | Design, supply, install & commission MIL KSB Control Valve at Segari Power Plant- Lumut | |
| 11 | Multiflue Chimney Repair Works at TNB Janamanjung | |
| 12 | Supply, install & commission HPU (Bottom Ash Hopper Silo Gate Valve) at TNB Janamanjung | |
| 13 | Service & supervise boiler feed pump at Kapar Power Plant | |
| 14 | Design, install & commissioning minimum recirculating boiler feed water stop valve at Perlis Power Plant | |
| 15 | Supply, install, commissioning boiler blow down and station ash pump at TNB Janamanjung | |
| 16 | Installation & commissioning of various pump at Kapar Power Plant | |
| 17 | Supply, install & commissioning Tricentric Butterfly Valve c/w electric actuator | |
| 18 | Replacement of existing sodium hypochlorite injection pipeline at Kapar Power Plant | |
| 19 | Installation & commissioning of various pumps at TNB Janamanjung | |
| 20 | Supply various sizes boiler tubes (t91, a210, f22,) at Kapar Power Plant | |
| 21 | Supply HP circulation pump to Connaught Power Station. | |
| 22 | Supply boiler feed pump to Connaught Power Station. | |
| 23 | Supply boiler feed pump booster pump to Manjung Power Station. | |
| 24 | Supply spare parts for condenser extraction pump to Manjung Power Station. | |
| 25 | Supply BFP booster pump to Kapar Power Plant. | |
| 26 | Supply high pressure sluice pump shaft and accessories for kapar power station | |
| 27 | Supply high pressure sluice pump spare parts for Kapar Energy Ventures Sdn Bhd | |
| 28 | Supply HP sluice pump bearing housing for Kapar Energy Ventures Sdn Bhd. | |
| 29 | Supply spare parts for Hopkinson bled steam non return valves to Manjung Power Station. (Manufactured By Weir Valves & Controls UK) | |
| 30 | Supply spare parts for Hopkinson Check Valve to Manjung Power Station. | |
| 31 | Supply valve bled steam NRV (cold reheat) complete without actuator to Manjung Power Station. | |
| 32 | To supply spare parts for GF3 cold reheat non return valve overhaul at Kapar Power Station. | |
| 33 | Supply of cold reheat non return valve for Kapar Energy Ventures Sdn Bhd. | |
| 34 | Supply boiler feed pump spare parts for Kapar Power Plant | |
| 35 | Supply boiler feed pump spare parts for Manjung Power Station. | |
| 36 | Supply Hopkinsons Valve Spare Parts for TNB Janamanjung - on going | |
| 37 | Supply of KSB submersible pumps complete with motors for TNB | |
| 38 | Supplied various parts for GE turbine frame 9e at Pahlawan Power Plan | |
| 39 | Supplied bearing oil cooler- shell & tubes at Manjung Power Plant- Boiler Feed Pump | |
| 40 | Supplied boiler feed pump cartridge to Kapar Power Plant | |
| 41 | Supplied condensate extraction pumps to Manjung Power Station | |
| 42 | Dismantle, install & commissioning 2 nos of heat exchanger- shell & tubes at Kapar Power Plant Ph 3 | |
| 43 | Supplied various spare parts for booster & boiler feed pump for Kapar Power Plant | |
| 44 | To supply & apply polyurea coating on the steel structure- corrosion mitigation at Kapar Power Plant | |
| 45 | Repair & service hp turbine bypass valve at Perlis Power Plant | |
| 46 | To replace auxially shell & tubes heat exchangers to Kapar Power Plant PH 1 | |
| 47 | To replace shell & tubes heat exchangers for turbine oil cooler to Pahlawan Power Plant | |
| 48 | Install 23 nos of Sanilec Electrolysers at Port Dickson Power Plant (year 2012) | |
| 49 | To supply, install and servicing IPBS at TNB Janamanjung | |
| 50 | To supply, and install 10 nos of Sanilec Electrolyers at Port Dickson Power Plant - year 2013 | |
| 51 | To design, install and commissioning portable demin water plant at Port Dickson Power Plant | |
| 52 | To supply, testing & commissioning 1 no of 412 KVA, Transformer at TNB Port Dickson - Year 2012 | |
| 53 | To dismantle, install & commissioning 2 nos of Transformer rectifier (5200 Amp @ 110 DC) at Kapar Power Plant Ph 2- Year 2013 | |
| 54 | To refurbished 30 nos of SANILEC cells Stream A at Janamanjung Power Plant- Year 2014 | |
| 55 | To supply Transformer Rectifier spare parts- Dyanapower at TNB Port Dickson - Year 2014 | |
| 56 | To supply various type of spare parts for Cylde Burgnmann sootblower at Kapar Power | |
| 57 | To supply various type of spare parts for Cylde Burgnmann sootblower at Tanjung Bin Power Plant - Year 2009-2010 | |
| 58 | To supply rubber expansion joint - TPSC (Prai Power Plant) | |
| 59 | To fabricate steel structure at TNB Port Dickson Ph 2 - TPSC | |
| 60 | To replace, supply and install various type of idler and pulley at Kapar Power Plant - LTSA for 2 years | |
| 61 | To dismantle, install, test and commissioning 3.3 KV CONVEYOR & CRUSHER MOTOR | |
| 62 | To dismantle, supply, install and commissioning 1 set Rotor for Induced Draft Fan at Kapar Power Plant- Unit 6 | |
| 63 | To dismantle, supply, install and commissioning 1 set Rotor for Induced Draft Fan at Kapar Power Plant- Unit 5 | |
| 64 | To replace, supply and install various type of idler and pulley at Kapar Power Plant - Coal Unloaders | |
| 65 | Supply, refurbish, and install 30 nos of Sanilec Electrolysers at Manjung Power Plant - Stream 1 | |
| 66 | Supply, refurbish, and install 30 nos of Sanilec Electrolysers at Manjung Power Plant - Stream 2 | |
| 67 | Cooling Water Pipe Line Work - Prai Combined Cycle Gas Turbine Power Plant (Malaysia) | |
| 68 | To supply manpower & Machinery to HSL (Singapore) | |
| 69 | Installation of 508 nos. Of Precast, Pre stressed Concrete Spun Piles for the Construction of new Bulkhead, Wharf at Pulau Indah, Malaysia-To supply manpower & Machinery to HSL(Singapore) | |
| 70 | On Going- Offshore and onshore work scope for Track 3B- Super Critical Power Plant- Malaysia- To supply manpower & Machinery to HSL (Singapore) | |
| 71 | To replace, supply and install various type of idler and pulley at Kapar Power Plant - LTSA for 2 years (2013-2015) | |
| 72 | To dismantle, install, test and commissioning 3.3 K CONVEYOR & CRUSHER MOTOR | |
| 73 | To replace, supply and install various type of idler and pulley at Kapar Power Plant - Coal Unloader | |
| 74 | To replace, supply and install various type of idler and pulley at Kapar Power Plant - Coal stacker reclaimer | |
| 75 | To replace, supply and install bucket for coal unloader at Kapar Power Plant | |
| 76 | Supply, Install, Commissioning Boiler Blow Down and station Ash Plant at TNB Jana Manjung | |
| 77 | Design, supply and installation of 5 years ash pond run off forwarding pumps for coal and ash- TNB Jana Manjung | |
| 78 | Design, supply and installation of 5 years clean rain water pump for coal and ash- TNB Jana Manjung | |
| 79 | To replace, supply and install conveyor belt at Kapar Power Plant | |
| 80 | Structure repair of the existing stacker reclaimer B at Kapar Power Plant | |